Summary of the investment project in the Krasnoarmeysky Municipal District of the Saratov Region

“On Construction of an Oil Refining Factory with Annual Capacity of 6,000,000 tons for Raw Materials in the Krasnoarmeysky Municipal District of the Saratov Region”

It is planned to construct the factory at the site of total area about 1,016 hectares which is situated in 4 kilometers from Krasnoarmeysk town, the administrative center of the Krasnoarmeysky municipal district of the Saratov Region. The favorable geographical location of the chosen site ensures guaranteed supply of raw materials for the factory, as well as a full-scale transport and logistic infrastructure for shipping of trade goods by water, railway and motor transport.

In order to achieve the enterprise’s long-term competitiveness it is planned to choose the newest technological form of oil refining factory directed at the manufacture of European level quality oil products with the high added cost and export potential to be compatible with the Euro-4 and Euro-5 international quality standards, with expected depth of oil refining of more than 95 percent and the maximum indicator of light mineral oil selection.

As the result of this the Saratov Region will get:

  • High-performance enterprise with international competitiveness, producing “oil products basket” of European quality with high added cost and export potential satisfying the international market and ecological standards.
  • Oil products of high quality produced in accordance with advanced European quality standards.
  • Additional employment – 617 persons.
  • Annual revenues – 11.5 billion rubles.
  • Development of related sectors (oil extraction, petrochemistry) and infrastructure of the region and of its chemical science.
  • Facilitation of attracting investments into the Krasnoarmeysky municipal district of the Saratov Region.
Capital investments
Costs Amount, million rubles
I. Construction of the 1st start-up facility
Engineering services on conduct of exploratory design 3.0
Engineering services on feasibility study 30.1
Consulting services on selection of  project management team 0.9
Consulting services on project management 48.1
Elaboration of design documents 150.5
Expertise of the project 30.1
Equipment and building and assembly jobs 47,090.9
Engineering services on adjusting and start-up proceedings 18.1
TOTAL for section I: 47,371.7
II. Construction of the 2nd start-up facility
Equipment and building and assembly jobs 53,560.2
Engineering services on adjusting and start-up proceedings 27.1
Consulting services on project management 72.2
TOTAL for section II: 53,659.5
TOTAL FOR SECTIONS: 101,031.2
Basic  techno-economic indices
Annual raw material processing,  million tons 6.0
Range of produced goods:
diesel fuel (Euro-4, Euro-5) 40.3%
motor petrol (Euro -3, Euro -4, Euro -5) 42.5%
coke 6.1%
concentrated propylene 2.0%
modified bitumen 3.3%
liquefied  gas 3.3%
residual oil 2.5%
Total number of employees, persons 617
Aggregate sale proceeds, million rubles 96,264.9
Net cost of the products, million rubles 50,762.7
Profit tax, million rubles 4,491.9
Net income, million rubles 17,967.9
Efficiency, % 35%
Investment efficiency indices
Payback period of the project
– excluding discounting 10 years 10 months
– adjusted for discounting 17 years 10 months
Net present value (NPV) of the project, million rubles 25,988.9
Profitability index of investments (PI) 1.26
Accounting rate of return (ARR) 0.23
Internal rate of return  (IRR), % 76